Client Oil

Oil &Gas and Petrochemicals

Ein El - Sokhna And Sidi Krier Tank Farm:

Design, supply, supervision and commissioning of strip detection and Halon 1211 system "3200 lbs." for 4 floating roof tanks for crude oil one hundred thousand tons each.

Petroleum Pipe Lines Co. (PPC) - Suez gas pumping station supply:

 

Design, supply and commissioining of gas and heat detection, Halon 1301 and dry chemical powder system.

Enppi New Office Building (Nasr City):

Design, supply, supervision and commissioning of :  Halon 1301 system for electrical station,  Addressable fire alarm and detection system , Multiplexed intrusion alarm system,Card access system,Parking control system.

Gupco Main office building (new Maadi):

Design, supply, supervision and commissioning of detection and Halon 1301 system for computer rooms.

EGPC - Office Building Computer center (Maadi):

 

Design, supply, supervision and commissioning of detection and Halon 1301 system for computer rooms.

Suez Oil Processing Co.:

 

CO2 system for 3 electrical substations.

Egyptian Turkish Petroleum Co. ETPCO:

Design, engineering and supply of Foam and cooling systems for fixed roof tanks, portable extinguishers and hose cabinets for production area.

Misr Petroleum Company Lube Oil: 

Blending plant FM200 - (12000 lbs.) and weather proof cabinets.

Cairo Oil Refining Co. (CORC) Light Naphtha - Enppi:

Supply and installation of Analog addressable alarm and fixed water Spray system.

Ocean East Zeit Platform:

Replacement of Halon 1301 with FM- 200 for MCC room (off-shore rig).

Babcock Wilcox Espanola (Suez Oil Processing Company Extension):

Water spray, Fire extinguishers, CO2, Foam, hoses and alarm systems.

Wepco – FM200:

Halon replacement for NA/Q platforms with FM-200 systems.

Wepco – CO2:

Replacement of "Halon" systems for onshore facilities & offshore platform with CO2, gas & flame detection systems.

PPC Floating roof tank # 14 (Petrosafe):

(MTBE) automatic foam and cooling systems.

Petroleum complex Building at Amerea:

Intelligent / addressable fire alarm system for the entire building , Gas detection system , Hose rack system.

Archriodon / El Behera Natural Gas Liquefaction Co.:

 Fire alarm and FM-200 system for the jetty control room

Expansion of Sumed fire extinguishing system for new substation (Sub-10) Sidi Kerier (Petrojet): 

Addressable alarm detection and FM- 200.

G.P.C. (Petrojet): 

Hydrants, hoses reels.

 East Zeit Petroleum Company (Zeitco): 

FM-200 system for new MCC room (off-shore rig).

Gasco complex at Amerea:

Intelligent / addressable (PEGASYS) fire alarm system.

East Zeit Petroleum Company (Zeitco):

Halon replacement by CO2 system for three gas turbines (on-shore facility).

Gulf of Suez Petroleum Company (GUPCO): 

Design, engineering, flow calculation, supervision, commissioning and handing over of fire suppression systems with CO2 for Gas Turbines and generators (23 offshore & 12 onshore systems).Western Desert Operating Petroleum Company, WEPCO. EL Hamra Oil Company:

Western Desert Operating Petroleum Company, WEPCO. EL Hamra Oil Company:

Halon replacement with Foam and Cooling Systems for Fuel Tanks at El Hamra On-Shore facilities.

Petrojet:

Supply of fire hydrants for APC plant optimization and production expansion projects phase two at Aqaba Jordan.

SUMED: 

Complete FM-200 system for expansion of Sumed storage capacity project.  Design, fabrication, supply & testing of clean agent extinguishing system package for electrical rooms, total capacity of FM-200 (4660 lbs.).

SUCO – (Egyptian Maintenance Company):

Design, engineering, flow calculation, supervision, commissioning and handing over of fire suppression system with CO2 for Gas Turbines.

Khalda Petroleum Company:

Design, fabrication, supply & testing of a clean agent extinguishing system package for electrical rooms, total capacity of FM- 200 (10200 lbs.). Complete FM-200 system for expansion of Khalda Petroleum Co. control building Kalabsha 40.000 BOPD oil facility project.

Gulf Petroleum Suez Company (GUPCO):

FM-200, Gas Plant For Switch Gear Building PH I, Switch Gear Building PH II, Reducing Area, RSA Bakr, Battery Room.

Egyptian Bahraini Gas Derivatives Co. "EBGDCO”: 

FM-200 System for, Switch Gear room (ADS System), Battery Room, Control Room (ADS System), Equipment room & Cellar room (ADS System).

Petrogulf Misr:

Three Deluge Systems for Alfa Platform.

(ENPPI): 

Design, supply, installation and handing over of FM-200, CO2 and Sprinkler systems fire suppression system for EGPC central control building.

Qarun Petroleum Company:

East Baharia Power Station, Fire suppression systems with FM-200 and CO2.

Petrogulf Misr:

Design, supply, installation and handing over of off-shore Fire suppression system of FM-200 and CO2.

PETROBEL "Egyptian Maintenance Co.": 

Design, engineering, flow calculations, supervision, commissioning and handing over of fire suppression system with CO2.  Design, engineering, supervision, commissioning and handing over of Intelligent Fire Alarm System, Gas Detection System and Flame Detection System.

Arab Petroleum Pipelines Co. “SUMED”:

Design, engineering, flow calculations, supervision, commissioning and handing over of fire suppression system with (3444 lbs.) FM-200 clean agent for expansion of SUMED storage capacity at Sokhna Egypt.

Western Desert Operating Petroleum Company, WEPCO. EL Hamra Oil Company:

Design, engineering, Installation, commissioning and handing over of Intelligent fire alarm system and linear heat detection system for floating roof tank # 5.

Gulf Petroleum Suez Company (Gupco):

Halon Replacement with CO2 systems for off-shore gas turbines.

Western Desert Operating Pet. Co. (WEPCO):

Supply and installation of early warning detection system for Elhamra Port.